| Page:- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 |
| NAME OF THE PAPER |
AUTHOR’S NAME |
PAPER NO |
VOLUME NO. |
PAGE NO. |
REFERENCE |
| A NOTE ON THE RECONSTRUCTION OF ROADS CARRIED OUT IN THE U. P. WITH SPECIAL REFERENCE TO EXPERIMENTS CARRIED OUT AND THE USE OF TRAFFIC STATISTICS |
S.N. CHAKRAVARTI |
B-41 |
VIII |
5 – 42(f) |
JOURNAL 1943 |
| RAISING THE ROAD RUPEE RATIO WITH A SPECIAL REFERENCE TO THE STEEL TYRE |
W.L. MURRELL |
C-41 |
VIII |
43 – 56(g) |
JOURNAL 1943 |
| SOME EXPERIMENTS TO STABILIZE MOORUM ROADS IN CHOTANAGPUR |
K. GUPTA |
D-41 |
VIII |
57 – 74(b) |
JOURNAL 1943 |
| FURTHER DEVELOPMENTS IN VILLAGE CEMENTS & HIGH SILICA PORTLAND CEMENTS FOR THE CONSTRUCTION OF CEMENT CONCRETE ROADS |
A.K. DATTA |
E-41 |
VIII |
75 – 91(k) |
JOURNAL 1943 |
| BOAT BRIDGE ACROSS THE INDUS AT GAZIGHAT |
G.C. KHANNA |
F-43 |
VIII |
91 – 149(k) |
JOURNAL 1943 |
| SOME NOTES ON THE MAINTENANCE OF WATER-BOUND MACADAM |
A.L. RAO |
G-43 |
VIII |
151 – 155H |
JOURNAL 1943 |
| SUBMERSIBLE BRIDGE OVER THE UJH RIVER IN JAMMU PROVINCE |
S.B. TAYABJI |
H-43 |
VIII |
157 – 158(j) |
JOURNAL 1943 |
| REVISED SPECIFICATIONS FOR BITUMEN ROADS IN THE PUNJAB |
ABDUL AZIZ |
I-43 |
VIII |
161 – 184(i) |
JOURNAL 1943 |
| PROPOSALS FOR AN ALL-INDIA SURVEY OF BULLOCK-CARTS BY MEANS OF RANDOM SAMPLING |
J. VESUGAR |
J-43 |
VIII |
185 – 202(q) |
JOURNAL 1943 |
| CEMENT CONCRETING THE BOMBAY-POONA ROAD |
W.H.E. GARROD |
K-43 |
VIII |
203 – 216(h) |
JOURNAL 1943 |
| FUNDAMENTALS OF SOIL MECHANICS |
F.L.D. WOOLTORTON (COL.) |
L-43 |
VIII |
211 – 288(b) |
JOURNAL 1943 |
| MASONRY ARCH BRIDGE ACROSS THE KRISHNA AT DEOSAGAR, HYDERABAD (DECCAN) |
MD. FARHATULLAH |
M-43 |
VIII |
299 – 303 |
JOURNAL 1943 |
| CALCULATION OF THE STRUCTURE OF ROADS |
BRIG. W.G. LANG ANDERSON |
98 |
IX 1 & 4 |
1 – 6-1 &
1 – 18-4 |
1944 – 45 |
| BITUMINOUS TREATMENT OF WET AGGREGATES |
C.J. FIELDER |
99 |
IX 1 & 4 |
7 – 53-1 &
19 – 36-4 |
1944 – 45 |
| STABLE CAUSEWAYS ON UNSTABLE FOUNDATION SOILS |
M.A. MIRZA |
100 |
IX-2 & 4 |
55A – 69A-2 &
37 – 48-4 |
1944 – 45 |
| A DESIGN FOR BULLOCK-CART WHEELS |
B. V. VAGH |
101 |
IX-2 & 4 |
55 – 99-2 &
49 – 71-4 |
1944 – 45 |
| AJOY BRIDGE-FAILURE OF MASONRY PIERS-REMEDIAL MEASURES ADOPTED |
H.K. NIVAS |
102 |
IX-2 & 4 |
101 – 104-2 &
72 – 83-4 |
1944 – 45 |
| DESIGN & CONSTRUCTION OF THE PURNABHAVA BRIDGE |
J. CHAMBERS |
103 |
X-1 & 4 |
39 –123-1 &
655 – 696(b)-4 |
1945 – 46 |
| ROAD CONSTRUCTION IN BLACK COTTON SOILS |
A. NAGESWARA AYYAR |
104 |
X-1 & 4 |
125 – 132 -1 &
697 – 712-4 |
1945 – 46 |
| ECONOMICS OF HIGHWAY TYPES. |
K. S. RAGHAVACHARY |
105 |
X-1 & 4 |
133 –181-1 &
713 – 723-4 |
1945 – 46 |
| DRAINAGE IN HILL ROADS |
M. MAHAPATRA |
106 |
X-1 & 4 |
183 – 184-1 &
724 – 729-4 |
1945 – 46 |
| THE MAINTENANCE OF GRAVEL (MURAM) ROADS UNDER HEAVY TRAFFIC |
B. B. GUPTA |
107 |
X-2 & 4 |
211 – 217-2 &
730 –733-4 |
1945 – 46 |