print
Home TECHNICAL PAPERS PUBLISHED IN IRC JOURNAL
TECHNICAL PAPERS PUBLISHED IN IRC JOURNAL PAPER No. 1 – 538
Page 1 of  18
Next

Page:- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18  
NAME OF THE PAPER AUTHOR’S NAME PAPER NO VOLUME NO. PAGE NO. REFERENCE
LOW COST ROADS FOR THE EAST F.L.D. WOOLTORTON (LT. COL.) 125 XII-3 & 5 283 – 327-3 &
412 – 424-5
1947 – 48
EFFECT OF THE PHYSICO-CHEMICAL PROPERTIES OF SOILS ON ROAD PERFORMANCE A.G. ASGHAR
C.L. DHAWAN
126 XII-3 & 5 329 – 344-3 &
425 – 426-5
1947 – 48
A SURVEY OF TRAFFIC ON THE NEW HOWRAH BRIDGE K. B. MADHAVA 127 XII-3 & 5 345 – 407-3 &
427 – 433-5
1947 – 48
A DESIGN FOR BULLOCK-CART WHEELS, PART II. THE HUB, BEARINGS AND AXLE B. V. VAGH 128 XII-4 & 5 5 – 58-4 &
375 – 381-5
1947 – 48
THE TESTING OF THE R.C.C. BRIDGE OVER THE AURANGA RIVER J.A. TARAPOREVALA 129 XII-4 & 5 59 – 78-4 &
434 – 441-5
1947 – 48
SOME OBSERVATIONS ON LOAD TESTING TO AS-CERTAIN THE  FOUNDATION BEARING PRESSURES OF BRIDGE WELLS IN SANDY STRATA & ON THE ALTERNATIONS REQUIRED IN THE DESIGN OF A BRIDGE FOUNDATION OWING TO ONE WELL FOR A PIER HAVING GONE OUT OF ALIGNMENT B.B. GUPTA 130 XII-4 & 5 79 – 92-4 &
442 – 443-5
1947 – 48
SOME TYPE DESIGNS OF UNREINFORCED HINGELESS MASONRY ARCHES BRIDGES COMMITTEE 131 XII-4 & 5 157 – 187-4 &
444 – 447-5
1947 – 48
VERTICAL CURVES AND SIGHT DISTANCES SPECIFICATIONS AND STANDARDS COMMITTEE 132 XII-5 189 1947 – 48
SUCCESSIVE FAILURE OF TWO HIGH LEVEL BRIDGES OVER THE BARAKAR C.D. MITRA 133 XII-5 & XIII-4 247 – 266-5 &
95 – 111-4
1947 – 48
BASIS OF ROAD PLANNING JAGDISH BAHADUR 134 XII-5 267 - 282 &
 448 - 455
1947 – 48
LOW COST ROADS IN INDIA AND USE OF SOIL SCIENCE FOR THEIR IMPROVEMENT G. SRIRANGACHARY 135 XIII-1 & 4 59 –146-1 &
112 – 132-4
1948 – 49
A STUDY OF CEMENT CONCRETE ROADS WITH SPECIAL REFERENCE TO BOMBAY PROVINCE L.T. AMINBHAVI 136 XIII-1 & 4 147 –168-1 &
133 – 157-4
1948 – 49
A DESIGN FOR BULLOCK-CART WHEELS PART III B. V. VAGH 137 XIII-2 181 – 239-2 &
158 – 171-4
1948 – 49
POLICY CONCERNING MAXIMUM DIMENSIONS, WEIGHTS AND SPEEDS OF MOTOR VEHICLES IN INDIA SPECIFICATIONS & STANDARDS
COMMITTEE
138 XIII-2 & 4 241 – 285-2 &
172 – 177-4
1948 – 49
REPARING AND HEALING OF CRACKS IN REINFORCED CONCRETE BRIDGES M.A. KORNI (DR.) 139 XIII-3 & 4 321 – 346-3 &
178 – 182-4
1948 – 49
SOME CAUSEWAYS ON SANDY BED Y.K. LALL 140 XIII-3 & 4 347 – 376-3 &
183 –192-4
1948 – 49
FUNDAMENTALS OF HIGHWAY NEEDS AND HIGHWAY PLANNING D.G. BHAGAT
JAGDISH BAHADUR
141 XIII-3 & 4 377 – 417-3 &
193 – 197-4
1948 – 49
FAILURE OF A FIVE SPAN MASONRY ARCH BRIDGE ACROSS THE BHOGESWARI RIVER NEAR PEN DIST.KOLABA IN THE PROVINCE OF
BOMBAY
K.G. BHATE 142 XIV-1 & 4 21 – 46-1 &
485 – 499-4
1949 – 50
A SMALL SCALE TRAFFIC SURVEY IN NEW DELHI C. S. ANANTAPADMANABHAN 143 XIV-1 & 4 47 –121-1 &
500 – 506-4
1949 – 50
WELL FOUNDATIONS OF THE KATHJURI BRIDGE SUDHINDRA NATH GUPTA 144 XIV-2 & 4 153 – 152-2 &
507 – 522-4
1949 – 50
STABILITY OF DENSIFIED SOIL UNDER ADVERSE MOISTURE CONDITIONS SACHINDRA NATH GUPTA 145 XIV-2 & 4 193 – 246-2 &
523 – 531-4
1949 – 50
GLOSSARY OF HIGHWAY ENGINEERING TERMS SPECIFICATIONS & STANDARDS
COMMITTEE
146 XIV-3 & 4 247 – 272-3 &
532 – 536-4
1949 – 50
AN ADAPTABLE STEEL CENTERING FOR R.C. BRIDGES A. NAGESWARA AYYAR 147 XIV-3 & 4 273 – 291-3 &
537 – 547-4
1949 – 50
A DESIGN FOR BULLOCK-CART WHEELS, PART IV B. V. VAGH 148 XV-1 & 4 65 –154-1 &
627 – 633-4
1950 – 51
STANDARDS FOR SIGHT DESTANCES FOR HIGHWAYS SPECIFICATIONS & STANDARDS
COMMITTEE
149 XV-1 & 4 155 –181-1 &
634 – 637-4
1950 – 51
CONSTRUCTION OF APPROACHES TO THE MALAVIYA BRIDGE AT BANARAS K. SINHA 150 XV-3 & 4 207 – 235-2 &
638 – 642-4
1950 – 51
A DESIGN FOR BULLOCK-CART WHEELS, PART V B. V. VAGH 151 XV-2 & 4 237 – 279-2 &
627 – 633-4
1950 – 51
ORGANISATION OF BRIDGING ACTIVITIES G.R. NANGEA 152 XV-2 & 4 281 – 319-2 &
643 – 647-4
1950 – 51
SOME EXAMPLES OF PLANNING SURVEYS R.P. CHANDA 153 XV-3 & 4 365 – 392-3 &
648 –650-4
1950 – 51
BEHAVIOUR OF BRICK METAL IN TAR CARPETS K.C. DE 154 XV-3 & 4 393 – 413-3 &
651 – 658-4
1950 – 51
CONSTRUCTION OF THE KUAKHAI BRIDGE IN ORISSA SUDHINDRA NATH GUPTA 155 XV-3 & 4 417 – 447-3 &
659 – 662-4
1950 – 51
VERTICAL CURVES FOR HIGHWAYS SPECIFICATIONS & STANDARDS
COMMITTEE
156 XVI-1 & 4 22 – 76-1 &
506 – 516-4
1951 – 52
GROUTED CONCRETE ROADS E.A. NADIRSHAH 157 XVI 1 & 4 77 – 130-1 &
517 – 536-4
1951 – 52
CONSTRUCTION OF THE SHILLONG - SILCHAR ROAD, ASSAM S.C. PAL
R.C. DAS
158 XVI-2 & 4 151 – 204-2 &
537 – 544-4
1951 – 52
Page 1 of  18
Next