| Page:- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 |
| NAME OF THE PAPER |
AUTHOR’S NAME |
PAPER NO |
VOLUME NO. |
PAGE NO |
REFERENCE |
LANDSLIDE INVESTIGATION AND TREATMENT IN ASSAM |
G.C. SHARMA |
212 |
XXIII-3 & 4 |
479 – 549-3 &
808 – 829-4 |
1958 – 59 |
SOME STUDIES IN SOIL MECHANICS AS APPLIED TO ROADS IN WEST BENGAL |
S.N. GUPTA
P.L. DE |
213 |
XXIV-1 & 5 |
27 – 69-1 &
823 – 843-5 |
1959 – 60 |
DESIGN AND CONSTRUCTRION OF TRAINING WORKS OVER RIVER GHOGRA AT AYODHYA |
N.C. BHARGAVA |
214 |
XXIV-1 & 5 |
71 – 115-1 &
844 – 851-5 |
1959 – 60 |
INVESTIGATION INTO CAUSES OF CRACKS IN CERTAIN CONCRETE PAVEMENTS |
BRIG. S.K. BOSE |
215 |
XXIV-1 & 5 |
117 – 141-1 &
852 – 872-5 |
1959 – 60 |
FLOOD DISCHARGE ESTIMATION FOR SMALL CATCHMENTS |
B. BALWANT RAO |
216 |
XXIV-2 & 5 |
221 – 283-2 &
873 – 885-5 |
1959 – 60 |
DESIGN AND CONSTRUCTION OF PRESTRESSED CONCRETE BRIDGES ACROSS KUNWARY RIVER |
Y.K. PATIL
C.V. KAND |
217 |
XXIV-2 & 5 |
286 – 333-2 &
886 – 916-5 |
1959 – 60 |
CRYSTAL PATTERN FORMULA FOR INTERGRATED HIGHWAY PLANNING IN INDIA |
K.C. MITAL |
218 |
XXIV-2 & 5 |
336 – 399-2 &
917 – 931-5 |
1959 – 60 |
SCIENTIFIC DESIGN AND LAYING OF A BITUMINOUS CARPET ON A NATIONAL HIGHWAY |
S.R. MEHRA
C.G. SWAMINATHAN
V.R. VAISH |
219 |
XXIV-3 & 5 |
475 – 516-3 &
932 – 949-5 |
1959 – 60 |
ROAD TRANSPORT OPERATION COST ON VARIOUS TYPES OF SURFACES |
N.D. DAFTARY
M.K. GANGULI (DR.) |
220 |
XXIV-3 & 5 |
517 – 540-3 &
950 – 955-5 |
1959 – 60 |
ORIGIN AND DESTINATION STUDY OF TRAFFIC OF GREATER DELHI |
T.S. KHANNA
T.R. SEHGAL |
221 |
XXIV-4 & 5 |
579 – 627-4 &
956 – 968-5 |
1959 – 60 |
REGIONAL CONCEPT FOR HIGHWAY PLANNING - THE WEB AND LATTICE PATTERN |
D.G. BHAGAT |
222 |
XXIV-4 & 5 |
629 – 665-4 &
917 – 931-5 |
1959 – 60 |
AN INVESTIGATION FOR EVALUATING AN AIRFIELD PAVEMENT |
DR. H.L. UPPAL
H.S. BHATIA |
223 |
XXV-1 & 4 |
25 – 60-1 &
539 – 561-4 |
1960 – 61 |
A STUDY IN ROAD FAILURES |
S.N. GUPTA
P.L. DE |
224 |
XXV-1 & 4 |
61 – 80-1 &
562 – 575-4 |
1960 – 61 |
STRESSES IN THE CORNER REGION OF THIN BONDED CONCRETE ROAD SLABS |
S. KOTESWARA RAO
S. VENKATASUBRAMANIAN |
225 |
XXV-2 & 4 |
149 – 162-2 &
576 – 587-4 |
1960 – 61 |
STUDY ON THE STABILITY OF WELL FOUNDATIONS FOR MAJOR BRIDGES |
A. BANERJEE
S. GANGOPADHYAY |
226 |
XXV-2 & 4 |
163 – 184-2 &
588 – 600-4 |
1960 – 61 |
DESIGN AND CONSTRUCTION OF UDYAVAR BRIDGE |
A.S. ADKE (DR.)
C. CHIDAMBARAM |
227 |
XXV-3 & 4 |
235 – 292-3 &
601 – 609-4 |
1960 – 61 |
STUDY OF PARKING PROBLEMS-CONNAUGHT PLACE AND CONNAUGHT CIRCUS AREA, NEW DELHI |
JOGINDER LAL |
228 |
XXV-3 & 4 |
293 – 321-3 &
610 – 621-4 |
1960 – 61 |
LOAD TEST ON THE MASONRY ARCH BRIDGE ACROSS UPPODAI |
K. RAMASWAMY REDDY
K. SREENIVASA RAO |
229 |
XXVI-1 & 4 |
29 – 105-1 &
670 – 687-4 |
1961 – 62 |
PARKING IN MOUNT ROAD |
R. THILLAINAYAGAM
P. S. SRIHARI |
230 |
XXVI-2 & 4 |
207 – 263-2 &
688 – 694-4 |
1961 – 62 |
ANALYTICAL STUDY OF SOME BRIDGE ARTICULATION FAILURES |
S.N. SINHA
B. PRASAD
P.J. PRASAD |
231 |
XXVI-2 & 4 |
265 – 307-2 &
695 – 724-4 |
1961 – 62 |
STANDARD SPECIFICATIONS AND CODE OF PRACTICE FOR ROAD BRIDGES, SECTION VI-COMPOSITE CONSTRUCTION FOR ROAD CULVERTS & MEDIUM SPAN BRIDGES |
BRIDGE COMMITTEE |
232 |
XXVI-2 & 4 |
309 – 316-2 &
725 – 734-4 |
1961 – 62 |
DESIGN AND CONSTRUCTION OF CEMENT CONCRETE PAVEMENT ON AGRA-MATHURA SECTION OF N.H. NO.2 |
H.C. VERMA
D.C. CHATURVEDI |
233 |
XXVI-3 & 4 |
393 – 439-3 &
735 – 753-4 |
1961 – 62 |
DESIGN AND CONSTRUCTION OF AJOY BRIDGE |
S.K. SAMADDAR
A.K. ROY |
234 |
XXVI-3 & 4 |
441 – 489-3 &
754 – 762-4 |
1961 – 62 |
ASEISMIC DESIGN OF BRIDGES |
R.N. JOSHI
M.P. APTE |
235 |
XXVII-1 & 5 |
27 – 48-1 &
767 – 792-5 |
1962 – 63 |
LOAD TEST OF GANGA BRIDGE AT GARHMUKTESHWAR |
SHITALA SHARAN
J.K. BHARGAVA |
236 |
XXVII-1 & 5 |
50 – 99-1 &
793 – 815-5 |
1962 – 63 |
PRACTICAL LESSONS IN VERTICAL SAND DRAIN INSTALLATION |
S.R. MEHRA
T.K. NATARAJAN |
237 |
XXVII-2 & 5 |
169 – 195-2 &
816 – 829-5 |
1962 – 63 |
CONSIDERATIONS IN THE DESIGN AND SINKING OF WELL FOUNDATIONS FOR BRIDGE PIERS |
B. BALWANT RAO
C. MUTHUSWAMY |
238 |
XXVII-3 & 5 |
421 – 502-3 &
830 – 877-5 |
1962 – 63 |
DRAFT CODE OF PRACTICE FOR ROAD MARKINGS |
TRAFFIC ENGINEERING COMMITTEE |
239 |
XXVII-4 & 5 |
515 – 539-4 &
878 – 897-5 |
1962 – 63 |
PERFORMANCE OF RIGID PAVEMENTS IN RELATION TO DESIGN,LOADING AND NUMBER OF LOAD APPLICATIONS IN THE AASHO TEST AND
UTILISATION OF ITS RESULTS0 |
C.L.N. IYENGAR |
240 |
XXVII-4 & 5 |
541 – 587-4 &
898 – 905-5 |
1962 – 63 |
EXPERIENCES IN SOIL COMPACTION AND STABILIZATION ON NATIONAL HIGHWAY NO.2 & 6 IN WEST BENGAL |
S.N. GUPTA
M.K. CHATTERJEE
D.P. BASU |
241 |
XXVIII 1 & 4 |
33 – 88-1 &
675 – 701-4 |
1963 – 64 |
LOAD TEST ON NAPIER BRIDGE, MADRAS |
R. GOPALAKRISHNAN
T.P. GANESAN |
242 |
XXVIII-1 & 4 |
89 – 141-1 &
702 – 717-4 |
1963 – 64 |
SPEEDY CONSTRUCTION OF AERODROMES |
D. DUTT
V. NARAYANAN |
243 |
XXVIII-2 & 4 |
163 – 202-2 &
718 – 750-4 |
1963 – 64 |
DEVELOPMENT OF MADRAS AERODROME FOR BOEING OPERATIONS |
C. DEVASENAPATHY |
244 |
XXVIII-2 & 4 |
203 – 228-2 &
718 – 750-4 |
1963 – 64 |
A FUNDAMENTAL PROCEDURE FOR THE DESIGN OF FLEXIBLE PAVEMENTS |
Y.K. SHARMA
B.S. BASSI |
245 |
XXVIII-2 & 4 |
309 – 352-2 &
751 – 768-4 |
1963 – 64 |
A STUDY OF ACCIDENT PRONE SPOTS IN DELHI |
DR. N.S. SRINIVASAN
T.R. SEHGAL
RAVI PRAKASH |
246 |
XXVIII-3 & 4 |
355 – 381-3 &
769 – 780-4 |
1963 – 64 |